Automatic Bridge Design Parameter Extraction for Scan-to-BIM

Citations

WEB OF SCIENCE

11

초록

Building information modeling (BIM), which can efficiently manage the life cycle of structures, has been increasingly applied in the construction industry. However, it is difficult to implement BIM for existing structures, due to the differences between the design and as-built conditions. Point cloud data (PCD) can be obtained through the scan-to-BIM process, which builds a model based on the current state of the structure. The scan-to-BIM process is complicated for bridge structures and consumes significant time and resources. Therefore, this study developed a system to extract bridge design parameters automatically to reduce the time and resources for the scan-to-BIM process. The proposed automatic bridge design parameter extraction is performed in three steps: (1) noise reduction, (2) 3D transformation, and (3) parameter extraction. The validation test was conducted on the Osong test track fifth bridge in Nojang-ri, Jeondong-myeon, Yeongi-gun, Chungcheongnam-do, Korea. The system developed in this study successfully extracted the design parameters of the bridge from the PCD automatically, resulting in 0.8% error rate.

키워드

bridge design parameter; parameter extraction; scan-to-BIM; point cloud data
제목
Automatic Bridge Design Parameter Extraction for Scan-to-BIM
저자
Lee, Jae Hyuk; Park, Jeong Jun; Yoon, Hyungchul
DOI
10.3390/app10207346
발행일
2020-10
유형
Article
저널명
APPLIED SCIENCES-BASEL
권
10
호
20
페이지
1 ~ 17