Physiological Status Assessment of Locomotive Engineer During Train Operation

Physiological Status Assessment of Locomotive Engineer During Train Operation
  • 송용수; 
  • 백종현; 
  • 황도식; 
  • 이정환; 
  • 이영재; 
  • 외 3명

초록

In this study, physiological status of locomotive engineers were measured through EEG,ECG, EDA, PPG and respiration signals from 6 subjects to evaluate their arousal status during train operating. Existence of tunnels and mechanical vibration of train using 3-axes acceleration sensors were recorded simultaneously and were correlated with operator’s physiological status. As the result of the analyzed subjects’ physiological signals, mean SCR was increased in the section where more body movement is required. The RR interval was decreased before and after train stop due to the higher level of mental tension. The intensity of beta wave of EEG was found to be higher before and after train stop and tunnel section due to the increased mental arousal and tension. Therefore, it is expected that the outcomes of the physiological signals explored in this study can be utilized as the quantitative assessment methods for the arousal status to be used for sleepiness prevention system for vehicles operators which can greatly contribute to public transportation system safety.

키워드

Arousal status; Emotion status; Locomotive engineer; Physiological signal; Sleepiness prevention system
제목
Physiological Status Assessment of Locomotive Engineer During Train Operation
제목 (타언어)
Physiological Status Assessment of Locomotive Engineer During Train Operation
저자
송용수; 백종현; 황도식; 이정환; 이영재; 박희정; 최주현; Heui-Kyung Yang
DOI
10.5370/JEET.2014.9.1.324
발행일
2014-01
저널명
Journal of Electrical Engineering & Technology
권
9
호
1
페이지
324 ~ 333