호남테스트베드구간의 GIS기반 통합 모니터링구축 계획

Plan of Integrated Monitoring Establish Base on GIS in the Honam Testbed

초록

For speed up of railway need to development infrastructure that can ensure the safety when high speed running. Therefore building testbed which can be high speed running to 400km/h and laiad sensor in the standard embankment section, poor ground section, connection zone. So we have been made to various change in track construction when running train service. However currently monitoring system exist limit of characteristic understanding cause by fixed point of measurement. For this reason the need for boarding monitoring has emerged. In this paper, we intend to discuss the plan to integrated monitoring in the Honam testbed, which is synchronization based on GIS.

제목
호남테스트베드구간의 GIS기반 통합 모니터링구축 계획
제목 (타언어)
Plan of Integrated Monitoring Establish Base on GIS in the Honam Testbed
저자
최찬용; 윤재찬; 배은지
발행일
2017-05-18
학회명
2017 한국철도학회 창립20주년 춘계학술발표대회
개최지
부산항국제여객터미널컨벤션센터
개최국가
대한민국
학회 개최일
2017-05-18 ~ 2017-05-20