도시철도 부하 패턴 기반 ESS 최대 용량 산정 및 동작 알고리즘 연구

Study on ESS Maximum Capacity Calculation and Operation Algorithm based on Load Pattern of Substations in Urban Railway

초록

Abstract - In this paper, we introduce the method of reducing only the morning peak of the ESS and the method of calculating the maximum ESS capacity according to the method of reducing the entire day by using the characteristic that the load of the urban railway substation shows a different load pattern depending on weekdays, weekends, and holidays. Furthermore, an operation method suitable for urban railroad is introduced using the operation algorithm for each of the five points of time of the ESS according to the load pattern. To verify the introduced maximum capacity calculation method and ESS operation algorithm, power analysis program, PSCAD/EMTDC was used

키워드

Urban railroad; Sizing; Elecricity cost reduction; Energy storage system; Load pattern
제목
도시철도 부하 패턴 기반 ESS 최대 용량 산정 및 동작 알고리즘 연구
제목 (타언어)
Study on ESS Maximum Capacity Calculation and Operation Algorithm based on Load Pattern of Substations in Urban Railway
저자
윤치명; 조규정; 김형철; 김철환; 정호성
DOI
10.5370/KIEE.2021.70.9.1405
발행일
2021-09
저널명
전기학회논문지
권
70
호
9
페이지
1405 ~ 1412