기존선 고속화에 따른 화물열차 지연영향 분석

Analysis of the Delay Effects on Freight Trains According to Increased Operating Speed of Existing Lines

초록

According to the plan to speed up the conventional lines, the project to speed up the major rail line is underway. The semi high-speed trains with 250km/h are operating for a passenger from 2021 in the Jungang line. When the speed of the existing railway lines is increased, the track capacity will be lowered due to the speed of difference of each train. Generally, the lowest-speed freight trains have much lower priority than passenger trains, causing serious disruptions in operation. When the 250km/h passenger train is newly operated on the Jungang line, the problem of lowering the priority of freight trains becomes more worse. In this paper, we analyzed the delay effect of freight trains due to the operation of semi-high-speed passenger trains on existing lines. To this end, the trains and stations were represented using a time-space network. And we modeled by mixed integer programming method to solve the problem. The train conflict problem was analyzed through a column generation algorithm. As a result of this study, we suggested the necessity of speeding up freight trains and the appropriate operation speed of freight trains

키워드

Semi high-speed trainsFreight trainDelay propagationMixed integer programmingTimetabling problem
제목
기존선 고속화에 따른 화물열차 지연영향 분석
제목 (타언어)
Analysis of the Delay Effects on Freight Trains According to Increased Operating Speed of Existing Lines
저자
김영훈한성호
DOI
10.5370/KIEEP.2021.70.4.226
발행일
2021-12
저널명
전기학회 논문지 P권
70
4
페이지
226 ~ 232