철송 크레인 일정계획문제에 관한 연구

회생전력, 전동열차시각표작성, 정수계획법, 도시철도

초록

This paper considers the rail crane scheduling problem with minimizing the sum of the range of order completion time and make-span of rail crane simultaneously. The range of order completion time implies the difference between the maximum of completion time and minimum of start time. Make-span refers to the time when all the tasks are completed. At a rail terminal, logistics companies wish to concentrate on their task of loading and unloading container on/from rail freight train at a time in order to increase the efficiency of their equipment such as reach stacker. In other words, they want to reduce the range of their order completion time. As a part of efforts to meet the needs, the crane schedule is rearranged based on worker's experience.We formulate the problem as a mixed integer program. To validate the effectiveness of the model, computational experiments were conducted using a set of data randomly generated.

제목
철송 크레인 일정계획문제에 관한 연구
제목 (타언어)
회생전력, 전동열차시각표작성, 정수계획법, 도시철도
저자
김광태; 김경민; 김동희
발행일
2011-05-26
학회명
2011 한국철도학회 춘계학술대회