상세 보기
철도 시스템 개발에서 시스템공학 프로세스와 안전성 평가를 동시에 고려한 통합 프로세스에 관한 연구
- 윤재한;
- 이재천;
- 홍선호
초록
This paper proposes an integrated SE process for the development of railway systems with safety assessment included. Although the safety assessment process must be performed with SE process properly with good coordination, the interfaces between the two processes have not been clear. Thus, in many of safety critical system developments in Korea, it is difficult to assess safety in proper development phase. The process model proposed in this paper is based on both the concept of system life cycle and the repetitive use of SE process. In each of development phases, appropriate safety assessment methods are described. Also the evaluation of the integrated system incorporating safety factors is described. The resultant process model is expressed by the Enhanced Functional Flow Block Diagram (EFFBD) using a CASE tool. The model also allows timeline analysis for identifying activity flow and data flow, resulting in the effective management of process. In conclusion, the integrated process enable both the SE process and safety assessment process to cooperate with each other from early development phase throughout the whole system life cycle.
키워드
- 제목
- 철도 시스템 개발에서 시스템공학 프로세스와 안전성 평가를 동시에 고려한 통합 프로세스에 관한 연구
- 제목 (타언어)
- A Study on Integrated SE Process for the Development of the Railway Systems with Safety Assessment Included
- 저자
- 윤재한; 이재천; 홍선호
- 발행일
- 2007-08
- 저널명
- 한국철도학회논문집
- 권
- 10
- 호
- 4
- 페이지
- 438 ~ 443
- 언어
- KOR
- 출판사
- 한국철도학회
- 발행국가
- 대한민국
- 분량
- 6 페이지
- ISSN
- E 2288-2235
P 1738-6225