안전성 평가 프로그램 개발을 위한 공학적 안전관리 활동의 평가항목 도출 연구
- 노희민;
- 임경미
초록
The engineering safety management activity begins with the production of Preliminary Safety Plan by project. The project then establishes a Hazard Log. Hazard Identification and Analysis and Risk Assessment are then carried out. On the basis of the Risk Assessment, Safety Requirements are prepared. On the basis of the Safety Requirements, Engineering Safety Management activity plan is made. Then Engineering Safety Management activity is performed in order that Safety Requirements of system are lowered to reasonable practicability The railroad stability assessment program is the program for evaluates safety analysing Preliminary Risk Analysis, Risk Assessment Reports, Safety Requirements Specification, Safety Plan, Safety Case. This research will discuss an assessment item escape related to Engineering Safety Management activity assessment program development.
- 제목
- 안전성 평가 프로그램 개발을 위한 공학적 안전관리 활동의 평가항목 도출 연구
- 제목 (타언어)
- Assessment item escape research of the engineering safety management activity for an safety assessment program development
- 저자
- 노희민; 임경미
- 발행일
- 2009-11-19
- 학회명
- 2009 한국철도학회 추계학술발표대회
- 개최지
- 제주 해비치호텔&리조트
- 개최국가
- 대한민국
- 학회 개최일
- 2009-11-19 ~ 2009-11-21
- 언어
- KOR