상세 보기
초록
As the AGT system has never operated in Korea, the construction of test track is essential to the acquisition of safety for the passengers. However, the test track is a synthetic system including vehicle, power system, signalling, track etc, several factors must be considered. In this paper, we suggest the general guideline for the test track of AGT system and test items on test track through the investigation of leading test facilities in the world. Through continuous study and investigation, we fianlly will build the test track to verify the reliability requirements between the train and infrastructures.
- 제목
- 경량전철 시험선 구축에 관한 연구
- 저자
- 정종덕; 이안호; 한석윤
- 발행일
- 2000-05-18
- 학회명
- 2000 한국철도학회 춘계학술대회