- The paper presents methods of determining the capacity and installation positions of regenerative inverters installed in DC 1500V electric railway system. We suggested a method that approximates using parameters related to substations where regenerative inverters are installed, railway lines and operating motor cars, and another that calculates using regenerative power obtained from Train Performance Simulation (TPS) and Power Flow Simulation (PFS). We carried out TPS and PFS for Seoul Subway Line 5~8, calculating regenerative power and determining substations where regenerative inverters would be installed and the optimal capacity and number of inverters to be installed.
키워드
Electric Railway Substation; Regenerative Inverter; Regenerative Power; Electric Railway Substation; Regenerative Inverter; Regenerative Power
- 제목
- 직류 1500V 전기철도용 변전소의 회생인버터 용량 및 설치위치 선정 방법
- 제목 (타언어)
- Determining the Capacity and Installation Positions of Regenerative Inverters at DC 1500V Electric Railway Substations
- 저자
- 배창한; 한문섭; 김용기; 권삼영; 박현준
- 발행일
- 2006-09
- 저널명
- 전기학회논문지 B권
- 권
- 55B
- 호
- 9
- 페이지
- 478 ~ 484
- 언어
- KOR
- 출판사
- 대한전기학회
- 발행국가
- 대한민국
- 분량
- 7 페이지
- ISSN
- P 1229-2451