경부고속철도 콘크리트궤도 토공 및 원지반 침하(I)

Settlement of Embankment and Foundationfor Concrete Track of Gyungbu High Speed Railroad

초록

An application of concrete track is being actively processed for the construction of Korean railroad. The concrete track has an advantage to decrease the maintenance fee, but is very difficult system to maintain after earthwork settlement occurred. Therefore, the management and control of embankment and foundation settlement is very important for the successful concrete track construction. We expect that the main part of the settlement of the concrete track is the one of embankment and foundation supporting it. Settlements vulnerable to the concrete track among the causes of lots of settlements are primary consolidation and secondary compression settlement of foundation, creep settlement of embankment, settlement caused by train load, and unequal settlement resulting from the difference of embankment material and construction process. This paper investigated the settlement causes to make badly effects on the concrete track and also evaluated the settlement with field tests and numerical analysis.

키워드

콘크리트궤도; 침하; 토공 및 원지반; 고속철도; Concrete Track; Settlement; Embankment and Foundation; High Speed Railroad; Concrete Track; Settlement; Embankment and Foundation; High Speed Railroad
제목
경부고속철도 콘크리트궤도 토공 및 원지반 침하(I)
제목 (타언어)
Settlement of Embankment and Foundationfor Concrete Track of Gyungbu High Speed Railroad
저자
김대상; 양신추; 문재석; 이현정; 강대웅
발행일
2006-12
저널명
한국철도학회논문집
권
9
호
6
페이지
644 ~ 651