CHARACTERISTICS OF TRACK AND TRAIN BEHAVIORS ON BRIDGE/ EMBANKMENT TRANSITION ZONE ON HIGH-SPEED TEST SECTION

CHARACTERISTICS OF TRACK AND TRAIN BEHAVIORS ON BRIDGE/ EMBANKMENT TRANSITION ZONE ON HIGH-SPEED TEST SECTION

초록

It is very important to pay careful attention to construction of bridge/embankment transition zone for high-speed railway. The transition zone of the railway is the section in which roadbed stiffness is suddenly varied. Differences in stiffness have dynamic effects and these increase the forces in the track and the extent of deformation. An abrupt change of stiffness across two adjacent track portions cause irregular settlement of roadbed, track irregularity, lack of girder bending moment and reduction of lateral resistance. Especially on high-speed railway, track irregularity at transition zone cause sincere effect to track stability and train safety. So continuous maintenance is needed. To verify this effect and to improve transition zone capacity, in situ test, track irregularity and train acceleration test were performed on high-speed railway bridge/embankment transition zone.

제목
CHARACTERISTICS OF TRACK AND TRAIN BEHAVIORS ON BRIDGE/ EMBANKMENT TRANSITION ZONE ON HIGH-SPEED TEST SECTION
제목 (타언어)
CHARACTERISTICS OF TRACK AND TRAIN BEHAVIORS ON BRIDGE/ EMBANKMENT TRANSITION ZONE ON HIGH-SPEED TEST SECTION
저자
이일화; 강윤석; 김은
발행일
2005-06-29
학회명
Railway engineering