터널 라이닝 콘크리트 배면공동 두께에 따른 400MHz GPR 신호 변화에 관한 수치해석 연구

Effect of Thickness of an Air Cavity behind Concrete Tunnel Linings on 400 MHz GPR Time Signals: Numerical Simulation and Analysis

초록

This study proposes a practical method for evaluating the thickness of an air cavity (Hcavity) using low-frequency GPR. The interaction between low-frequency GPR signals with a center frequency of 400 MHz and air cavities with various thicknesses, which are formed behind tunnel concrete linings, is investigated using numerical analyses. The following three steps are performed: First, a numerical simulation model is developed to simulate transient electromagnetic wave propagations in an air cavity behind a tunnel concrete lining using open source software (gprMax). Second, based on the analytical results, a practical equation that relates the apparent time difference of EM reflections in the an air cavity and its thickness (Hcavity) is established. The results indicate that the ??? ?Hcavity relation is effective for evaluating the thickness of the air cavity Hcavity) with an error margin of 20% even for air cavities that are relatively thinner than the wavelength of primary GPR signals, λGPR (Hcavity /λGPR~1/8). Finally, the obtained analytical results are validated through comparison with the experimental results of previously reported studies.

키워드

GPR 탐사저주파 GPR라이닝 콘크리트공동공동두께GPR SurveyLow Frequency GPRConcrete LiningCavityThickness of Cavity
제목
터널 라이닝 콘크리트 배면공동 두께에 따른 400MHz GPR 신호 변화에 관한 수치해석 연구
제목 (타언어)
Effect of Thickness of an Air Cavity behind Concrete Tunnel Linings on 400 MHz GPR Time Signals: Numerical Simulation and Analysis
저자
이성진기성훈
DOI
10.7779/JKSNT.2023.43.2.95
발행일
2023-04
저널명
비파괴검사학회지
43
2
페이지
95 ~ 107