A STUDY ON THE ESTIMATION OF CURVING PERFORMANCE AND RUNNING SAFETY OF ELECTRIC MULTIPLE UNIT FOR CITY SUBWAY

A STUDY ON THE ESTIMATION OF CURVING PERFORMANCE AND RUNNING SAFETY OF ELECTRIC MULTIPLE UNIT FOR CITY SUBWAY

초록

For the safety of railway, it should be evaluated for the running safety by measuring the derailment coefficient. Although railway has run the fixed and maintained rail, some of railway is derailed. This report shows the results that performed the static load test, wheelset manufacturing for test, main line running test on the basis of the derailment theory and experience. It is executed main line test into more than 80km/h for estimating the curving performance and running safety of Gwangju EMU. As the test results, could confirm the curving performance and running safety of Gwangju EMU from the results of the wheel unloading, lateral force, derailment coefficient etc. Derailment coefficient was less than 0.8, and lateral force allowance limit and wheel load reduction ratio were enough safe.

제목
A STUDY ON THE ESTIMATION OF CURVING PERFORMANCE AND RUNNING SAFETY OF ELECTRIC MULTIPLE UNIT FOR CITY SUBWAY
제목 (타언어)
A STUDY ON THE ESTIMATION OF CURVING PERFORMANCE AND RUNNING SAFETY OF ELECTRIC MULTIPLE UNIT FOR CITY SUBWAY
저자
함영삼; 오택열
발행일
2005-07-06
학회명
1st EpsMso