상세 보기
서울 지하철 5호선 전동차 인버터장치의 장애 분석
- 최용운;
- 구정서;
- 유원희;
- 고효인
초록
Rolling stock is the method of railway transportation. Especially, in the subway system which has short headways particularly during the rush hours, even one train's trouble on the main line might influence the whole line. Accordingly, to prevent a train trouble on the main line, high expense is used for the maintenance parts, workforce and facilities, etc. according to the preventive maintenance program. Therefore, in designing a EMU, emphasis should be put on the minimization of trouble and its extending influence on the mainline with the priority of safety and reliability. Seoul subway line 5 is the line that complements the first stage Seoul subway(lines 1,2,3 and 4) and is built deeply with many curved sections causing lots of dust. Studies were made to find out the importance of car design, selection of specifications and continuous maintenance on the basis of the analysis and countermeasure of the line 5 EMU inverter trouble case.
- 제목
- 서울 지하철 5호선 전동차 인버터장치의 장애 분석
- 저자
- 최용운; 구정서; 유원희; 고효인
- 발행일
- 2008-11-13
- 학회명
- 2008 한국철도학회 추계학술대회