상세 보기
Performance Verification of Korean Tilting-Train Experimental and Running-Time Estimation of its Imaginary Production Version on the Gyeongbu line
초록
In the future, railway has to play a more important role to encounter the increasing problems within the transport sector. For attracting more traffic into the railway, it is important for railway to improve the competitiveness with other modes, especially as regards travel time or schedule speed. Korea is a mountainous country, with as much as 70% of the area is covered by hills and mountains. This geography places constraints on the minimum radius of curvature for the rail network. So it was expected that the speed of trains could be enhanced on the existing railway network without a huge investment in infrastructure by using tilting trains. Running time for tilting train is one of the most important factors, with which will be done whether the commercialization of tilting train is needed or not. In this paper, we first evaluate the performance of the Korean tilting train experimental. And then the running time and time saving of future tilting train production version will be evaluated compared with 2012’s conventional trains and non-tilting trains, based on the Gyeongbu line. So the time saving could be separated into two effects by enhanced dynamic capabilities of a train and tilting devices.
- 제목
- Performance Verification of Korean Tilting-Train Experimental and Running-Time Estimation of its Imaginary Production Version on the Gyeongbu line
- 저자
- 노학래
- 발행일
- 2013-10-22
- 학회명
- 2013 ICCAS
- 개최지
- 광주광역시
- 개최국가
- 대한민국
- 학회 개최일
- 2013-10-20 ~ 2013-10-23
- 언어
- ENG