상세 보기
초록
Recently, power distributed high-speed train with 430km/h(HEMU-430X) has developed in korea, 2012. However, the development of the train alone can not achieve the speed of high-speed rail system. So it needs the development of infrastructure system. In this paper, the project named “Application & technology development of high-speed rail infrastructure for 400km/h-class” being promoted in december 2010 will be introduced comprehensively.
- 제목
- 한국고속철도 인프라시스템 기술개발 및 Test-bed 구축
- 저자
- 엄기영; 윤희택; 김정환
- 발행일
- 2012-11-09
- 학회명
- 2012 한국구조물진단학회 추계학술대회